CostX · BOM Costing Studio for automotive & commercial seating
Industry average on a real seating program will surprise you. The answer is why quotes take weeks.
v12_final_FINAL_updated_v3.xlsx — version chaos as a way of life#REF! errors hide inside the quoteThe fix · meet CostX
One platform where the entire seating program is costed, tracked and approved — from RFQ to final quote.
Every number carries an owner, a revision and a timestamp. There is no second version to reconcile.
Engineers fill in structure and never see a cost figure. Margin data stops circulating by attachment.
Cost computed from CAD geometry and a live materials database — not estimated from last year's quote.
Nothing reaches the quote without a signed sign-off from every function that owns a number.
An OEM enquiry arrives with drawings, variants and volumes.
The CAD structure and every seat variant come in from the existing Excel sheet.
Excel inManufacturing enters cycle times, Purchase prices bought-out parts, Costing owns materials and overheads. Nobody sees anyone else's numbers.
6 rolesDimensions and material grade drive the price. Change a dimension and the cost follows.
9 enginesEngineering, Manufacturing, Purchase and Finance sign off before the Costing Manager can release the number.
5 sign-offsSales applies volumes and amortization and issues it — traceable to a person, a revision and a date.
Excel outRole-based collaboration
Each role sees exactly what it needs — and nothing it should not.
Imports the CAD structure and seat variants.
Never sees a cost figureDefines welding, riveting and cycle-time process costs at the source.
Owns raw materials, labor, overheads and scrap rates per variant.
Prices bought-out mechanisms with multi-supplier RFQs and quotes.
Runs side-by-side comparisons and locks the approved base cost.
Applies volumes and amortization, then issues the final quote.
Governance, not bureaucracy
Any change from any role bumps the revision, flags stale inputs and routes the sign-offs before a quote can be released.
A Design Engineer revises the DVP. Rev A becomes Rev B, and every dependent cost is flagged stale.
The notification feed tells the Test Engineer to resubmit against Rev B. Nobody chases anyone.
Engineering, Manufacturing, Purchase and Finance approve before the Costing Manager can release the number.
Every figure traces back to a person, a revision and a date — which is what makes the quote defensible when the OEM asks.
Tangible ROI · measured in a Tier-1 pilot
Measured in a six-week parallel run with a European Tier-1 seating supplier.
Costing teams at Tier 1 and Tier 2 suppliers in Pune, Chennai and Gurgaon run CostX on live programs today.
CostX · BOM Costing Studio
The manufacturing industry, finally on the same page — from RFQ to final quote.
Engineered to the last weld.