Weeks of email chasing became real-time approvals.
CostX · RFQ to Quote AI Intelligence Platform for Manufacturing Industry.
Industry average on a real manufacturing program will surprise you. The answer is why quotes take weeks.
v12_final_FINAL_updated_v3.xlsx — version chaos as a way of life
Costs travel by email; every handoff adds days of lag
Broken formulas and #REF! errors hide inside the quote
Margins exposed in files anyone can forward
Chasing versions across Engineering, Procurement and Finance.
Uncaptured cycle times and raw-material movement, with no path back to the source.
Data complexity, manual process, zero integration — cascading into margin leaks and late quotes.
The fix · meet CostX
One platform where the entire product program is costed, tracked and approved — from RFQ to final quote.
An OEM enquiry arrives with drawings, variants and volumes.
The CAD structure and every product variant come in from the existing Excel sheet.
Manufacturing enters cycle times, Purchase prices bought-out parts, Costing owns materials and overheads. Nobody sees anyone else's numbers.
Dimensions and material grade drive the price. Change a dimension and the cost follows.
Engineering, Manufacturing, Purchase and Finance sign off before the Costing Manager can release the number.
Sales applies volumes and amortization and issues it — traceable to a person, a revision and a date.
Role-based collaboration
Each role sees exactly what it needs — and nothing it should not.
Governance, not bureaucracy
Any change from any role bumps the revision, flags stale inputs and routes the sign-offs before a quote can be released.
A Design Engineer revises the DVP. Rev A becomes Rev B, and every dependent cost is flagged stale.
The notification feed tells the Test Engineer to resubmit against Rev B. Nobody chases anyone.
Engineering, Manufacturing, Purchase and Finance approve before the Costing Manager can release the number.
Every figure traces back to a person, a revision and a date — which is what makes the quote defensible when the OEM asks.
Tangible ROI · measured in a Tier-1 pilot
Weeks of email chasing became real-time approvals.
Leakage from hidden weld cycle times and tooling amortization.
A fully auditable trail, from CAD import to final quote.
Manual errors and uncaptured cycle-time costs, eradicated.
Measured in a six-week parallel run with a European Tier-1 supplier.
Costing teams at Tier 1 and Tier 2 suppliers in Pune, Chennai and Gurgaon run CostX on live programs today.